Hotline: +49 (0) 69 94 74 15 - 0

Nablus, Palestine

Nablus, Palestine
Municipal wastewater treatment plant incl. Sludge treatment, Nablus, Palestine – Capacity: 150.000 EW
Process procurement, construction and installation of the mechanical and electrical equipment for a wastewater treatment plant with sludge treatment incl. commissioning (including 2 years operation and maintenance).

Sludge load: 10.236 Kg/d

Sludge Treatment Technology: overflow basins; coarse and fine screens; ventilated grease and grit; primary treatment; surface aeration; static sludge thickening; mechanical dewatering of excess-sludge by belt thickeners; mesophilic anaerobic sludge digestion.

Award of Contract: 10/2010
Status: commissioned in 2013

Go back

© Copyright PASSAVANT Energy & Environment GmbH - All rights reserved - info@passavant-ee.com
German English