Hotline: +49 (0) 69 94 74 15 - 0

Gut Großlappen, Germany

Gut Großlappen, Germany
Sludge treatment plant, Gut Großlappen, Germany – Capacity: 2.500.000 EW

Process design, delivery and commissioning of the mechanical and electrical equipment for a wastewater treatment plant incl. sludge treatment.
Sludge load: 60.270 Kg/d

Sludge Treatment Technology: mesophilic sludge digestion; 4 digesters à 14.500 m³ and gas special parts; heating with double-pipe heat exchanger; row sludge pump station, sludge heat exchangers type Roediger; piping system for sludge, gas, service water, heating and air.

Award of Contract: 01/2005
Status: commissioned in 2008

Go back

© Copyright PASSAVANT Energy & Environment GmbH - All rights reserved - info@passavant-ee.com
German English