Gut Großlappen, Germany
Gut Großlappen, Germany
Sludge treatment plant, Gut Großlappen, Germany – Capacity: 2.500.000 EW
Process design, delivery and commissioning of the mechanical and electrical equipment for a wastewater treatment plant incl. sludge treatment.
Sludge load: 60.270 Kg/d
Sludge Treatment Technology: mesophilic sludge digestion; 4 digesters à 14.500 m³ and gas special parts; heating with double-pipe heat exchanger; row sludge pump station, sludge heat exchangers type Roediger; piping system for sludge, gas, service water, heating and air.
Award of Contract: 01/2005
Status: commissioned in 2008